ExamHelpDesk

Nutanix Certified Services Core – Quiz

1 / 15

Category: Nutanix Certified Services Core

1. A customer is running out of storage in an ESXi cluster. The customer wants to
add storage without paying for an additional hypervisor license.
Which option should the consultant recommend to meet the requirement?

2 / 15

Category: Nutanix Certified Services Core

2. A consultant is setting up a new vSphere cluster. Customer requirements are as
follows:
* VMs should automatically failover to another host if the host crashes
* Host CPU and Memory resources should be evenly balanced
* New VMs should be placed on the host with the most resources available
Which two settings should be turned on to meet the requirements? (Choose

two.)

3 / 15

Category: Nutanix Certified Services Core

3. An administrator needs to install prism central for their 2550 multi-cluster
environment. How should they deploy the application?

4 / 15

Category: Nutanix Certified Services Core

4. A CEO asks the IT administrator to provide a list of required resources to protect
current workloads and the two new SQL servers from a disaster. The Nutanix
environment is managed by Prism Central. Which option explains how to meet

the CEO’s request?

5 / 15

Category: Nutanix Certified Services Core

5. The networking team makes changes to the Top of Rack switches to which the
Nutanix cluster are attached. A few VMs are able to communicate with each
other on the same node but are unable to connect to other parts of the network.
What is the likely cause of this issue?

6 / 15

Category: Nutanix Certified Services Core

6. An administrator configure Active Directory (AD) authentication for their Nutanix
environment. When login in using an AD user account, the login process takes
more than one minute to complete. No delay occurs when logging a local
account.
What should the administrator confirm to resolve this issue?

7 / 15

Category: Nutanix Certified Services Core

7. An administrator is performing a set of routine checks and notes that Prism
Central is running with 4 vCPUs and 21 GB RAM. The organizations
environment is based on two Nutanix clusters with 170 VMs plus a Legacy
vSphere infrastructure. No manual changes have been done on Prism Central
VM. Which configuration justifies the current Prism Central configuration?

8 / 15

Category: Nutanix Certified Services Core

8. An administrator deploys Exchange on a Nutanix cluster. The administrator
creates two containers with RF2 configuration:
One container for Exchange One container for the other VMs
The Exchange VM is experiencing I/O performance issues.
Which changes to Storage Optimization should be used on the Exchange
container to enhance I/O performance?

9 / 15

Category: Nutanix Certified Services Core

9. An administrator needs to forecast infrastructure requirements for a new
program and its associated applications. Prior to the projected start of the new
program, all existing applications will be decommissioned.
How should the administrator perform this task?

10 / 15

Category: Nutanix Certified Services Core

10. An administrator receives reports that VDI desktop performance in an 8-node
Nutanix VDI environment is poor. Opening applications takes between 1 and 2
minutes.
When investigating the issue, the following conditions are found: Cluster
memory utilization: 80%
Cluster SSD utilization: 70% Average VM CPU Wait Time: 11% CVM CPU
utilization: 75%
Which action should be taken to improve VDI performance?

11 / 15

Category: Nutanix Certified Services Core

11. An administrator responsible for a VDI environment needs to investigate reports
of slow logins. The administrator finds that increasing the number of vCPUs
from 2 to 4 will reduce the login times.
Production workloads are consuming 75% of the host CPU on the cluster. The
administrator increases the vCPU count on all of the VDI VMs.
What are two impacts on the cluster? (Choose two.)

12 / 15

Category: Nutanix Certified Services Core

12. A consultant deploys a Nutanix cluster with AOS and ESXi. The cluster is
managed by a vCenter server. After installation, what should the consultant do

to ensure the cluster will support network segmentation?

13 / 15

Category: Nutanix Certified Services Core

13. After an onsite cluster deployment, a consultant prepares the deliverables for a
project closeout. Which two data in the As-Built Guide require adjustment or
might be missing completely? (Choose two.)

14 / 15

Category: Nutanix Certified Services Core

14. A customer has requested that a consultant create a Disaster Recovery Test for
their new Nutanix environments.
What should the consultant include in a custom plan to validate VM availability
across the network?

15 / 15

Category: Nutanix Certified Services Core

15. An existing Nutanix customer has several clusters in production and is adding a
new cluster. The customer wants to create an AHV cluster that has already
been racked and powered on remotely, with the factory image, using Prism
Central.
Which step should the consultant take next?

Your score is

0%

Scroll to Top